Description
- Interview: David Mazeyrie, Equipment Engineer
- Hallandsås Tunnels Project – A technical challenge – F. Dudouit, W. Burger
- Nant de Drance Pumped Storage Power Plant: the challenges of a major hydroelectric project in the Valais Alps – Gérard Seingre
- Bezons (92) – CSM Bessac has built a micro-tunnel in GRP pipes 1800 mm in diameter – A first in France – Jean-Noël Lasfargue
- Climate in very long railway tunnels – Rudolf Bopp, Verena Langner, Manuel Burghart
- CO2 sequestration – Jacques Schittekat