Description
– Deep shafts: source of innovation – Marie-Christine Michel, Editor in chief
– BIM for infrastructure… already the end of the tunnel ? – M. Beaufils, N. Delrieu, C. Dumoulin, F. Robert, M. Rives
– The Deep Shafts
– Access shaft to the Andra laboratory – N. Dias, R. Foin, J.M. Bosgiraud, F. Plas, M. Leguil
– Constrains, design and construction methods of the CIGEO five deep shafts – C. Gaudry, L. Moscone, H. Ouffroukh, R. Taherzadeh
– Design-Construction of 11 shafts in Doha, Qatar – O. Suteau, T. Lockhart, X. Perrin
– Worksites : Line 15 Lot T2E – Rear station of Noisy-Champs – F. Mai, Y. Zhang, J.p. Magnan
– The Schuman-Josaphat Rail Link – A. Cullus, B. De Pauw, P. Denayer