Tunnels et Ouvrages Souterrains – N°174 – Novembre-Décembre 2002

20,00 (20,00 Excluding tax)

This issue presents the recommendation of AFTES’ WG7: “The convergence-confinement method” (English version), and includes the following topic: LYONS-TORINO high-speed train. “Crossing the Alps to build Europe”.

The articles in this issue are not translated, only the abstracts of the articles are translated into English

 

SKU: TOS-174-FR Category:

Description

The articles in this issue are not translated, only the abstracts of the articles are translated into English.

  • “Jurassic Park” in underground works – P. GONZE
  • Aerodynamic calculations in railway tunnels. Simulations with the Ouranos program – L. FORT LOPEZ-TELLO, F. GIL
  • LYONS-TORINO high-speed train. “Crossing the Alps to build Europe” – Maurice GUILLAUD
  • AFTES International Conference at Toulouse
  • Fiches signalétiques des chantiers mécanisés

Recommendation of AFTES’ WG9 (French version)

  • Watertyhtening covers of underground structures by asphaltic or bituminous systems

Recommendation of AFTES’ WG21 (French version)

  • Quality guide for underground works

Recommendation of AFTES’ WG7 (English version)

  • The convergence-confinement method

Additional information

Author

AFTES

Language

French

Number of pages

104

ISSN (EN)

0399-0834

Year of publication

2002

Tunnels et Ouvrages Souterrains – N°174 – Novembre-Décembre 2002

20,00 (20,00 Excluding tax)

Add to cart