Tunnels et Ouvrages Souterrains – N°178 – Juillet-Août 2003

20,00 (20,00 Excluding tax)

This issue offers articles on: The Complex management of mucking for the Lötschberg and Saint-Gothard tunnels – Crossing the Swiss Alps: The construction of the world longest railway tunnel.

The articles in this issue are not translated, only the abstracts of the articles are translated into English.

 

SKU: TOS-178-FR Category:

Description

The articles in this issue are not translated, only the abstracts of the articles are translated into English.

  • Construction of the downstream section of the Blagis-Cachan interceptor – J.F. TEISSIER, P. RAMOND
  • Complex management of mucking for the Lötschberg and Saint-Gothard tunnels – T. BORCA, P.A. SCHERWEY
  • France-Switzerland technical seminar 2002
    – The challenge: TBM progress rates at Steg/Raron – F. BERTHOLET
  • Crossing the Swiss Alps: construction of the world longest railway tunnel – P. ZBINDEN
  • Watertightness and drainage of underground structures – J.L. MAHUET

Recommendations of the AFTES’ WG31 (French version):
Mise en peinture des ouvrages souterrains (GT31R1F1)

Additional information

Author

AFTES

Language

French

Number of pages

80

ISSN (EN)

0399-0834

Year of publication

2003

Tunnels et Ouvrages Souterrains – N°178 – Juillet-Août 2003

20,00 (20,00 Excluding tax)

Add to cart