Description
The articles in this issue are not translated, only the abstracts of the articles are translated into English.
- Construction and observation of the access shafts to the Bure (Meuse) underground laboratory – L. BERTRAND, J. PIRAUD, C. BAUER, H. REBOURS
- The Monte Carlo railway tunnel: rehabilitation of a damaged area – G. DOUBLOT, P. LANUQUE, P. MAGNIEN, V. SCHWALLER
- Technical visit: Schirmeck tunnel construction – P. BARATE
- SOCATOP, Paris area: Fire in a tunnel under construction. Back analysis of the fire occurred on March 5th, 2002, in the A86-motorway tunnel under construction – J-L. TORIS
Recommendations of the AFTES’ WG9 (French version):
- Dimensioning of protective screens for the geomembrane watertightening systems