Description
The articles in this issue are not translated, only the abstracts of the articles are translated into English.
- The Saint-Vallier diversion road tunnel – A. BRUN, P. VORON, V. AVRIL
- Extension of the underground research facility at 230 m depth in the Boom clay layer in Belgium: a shield for 80-meter length connecting gallery – C. RAMAECKERS, A.VAN COTTHEM, W. BASTIAENS, F. BERNIER, B. DE POORTER, B. KUSTERMANS
- Paris RER Line C. Rehabilitation works – Technical visit of the Ile-de-France AFTES delegation – F. DEMEME-COQUAND, P. RAMONDENC
- The role of real-time monitoring in the construction of large underground structures – J-G. LA FONTA
Recommendations of the AFTES’ WG26 (French version):
- Consideration of the geotechnical risks in the tunnelling project bidding documents