Description
The articles in this issue are not translated, only the abstracts of the articles are translated into English.
- ALPTRANSIT: instrumentation and in situ tests for two base tunnels in Alpine environment – Dr. Thut, M. Piedevache, M. Prouvot
- The Sinard tunnel on the A 51 motorway – P. Goyet, P. Hingant
- Voie des Mercureaux, Besançon – France. The “Bois de Peu” road tunnel – L. Bavière, B. Martinasso, C. Perret
- Main sewers to the North Brussels treatment plant : 7 km through Brussels without above ground disturbance – Ir.D. Delbaere
- How fire tests help to determine fire resistance of structures – G. Borot, C. Larive, C. Féron
- Technical performances of steel and polymer fiber reinforced concrete – B. De Rivaz
- International projects