Tunnels et Ouvrages Souterrains – N° 213 – Mai-Juin 2009

20,00 (20,00 Excluding tax)

This issue contains the following articles on: The perthus tunnel – The underground works of the RIzzanese hydro-power scheme – The Bjorvika immersed tunnel in Oslo, a highly constraining fire protection system.

The articles in this issue are not translated, only the abstracts of the articles are translated into English

 

SKU: TOS-213-FR Category:

Description

 

The articles in this issue are not translated, only the abstracts of the articles are translated into English

  • The perthus tunnel – Xavier Delaporte, Michel Ducrot, Jean-Luc Trottin
  • The underground works of the RIzzanese hydro-power scheme – Pierre Poilbout, Olivier Cheruy
  • The Bjorvika immersed tunnel – A highly constraining fire – Albert Benhamou
  • Adaptation of risk analysis tools to the future geological storage of CO2 – Philippe Gombert, Régis Farret
  • State-of-the-art of sprayed concrete nozzle operators’certification – Catherine Larive

Additional information

Author

AFTES

Number of pages

54

Year of publication

2009

Language

French

ISSN (EN)

0399-0834

Tunnels et Ouvrages Souterrains – N° 213 – Mai-Juin 2009

20,00 (20,00 Excluding tax)

Add to cart