Description
The articles in this issue are not translated, only the abstracts of the articles are translated into English.
- Line 9 of the Barcelona metro; excavation of the Can Zam-Rio Besòs – Carme Deulofeu i Palomas, Joan Serratosa Belles, Henning Schwarz
- The Sommand tunnel: short but as difficult as a long one – Michel Girod, Vincent Martin
- Rehabilitation of the SIAAP main sewer Sevres-Achères Rueil (SAR) branch – Alain Racher, Hervé Gaurat, Sébastien Kudla, Patrice Salvaudon
- Bex-Martigny A9-highway (Switzerland) performance of upgrading civil works with restoration of traffic over week-ends – Alain Deriaz, Sébastien Nendaz, Fréderic Gasser et Jean-Paul Schnetz
- Site visit of Violay tunnel works on the A89-East – Maurice Guillaud
- A new branch of the South-East Paris sewage network – Philippe Millard